2026 Rawalpindi & Islamabad Rate Engine
Home Construction Cost Calculator
Estimate material costs, Grade-60 steel, cement bags, bricks, tiles, and wiring for building your home in Rawalpindi & Islamabad.
Construction Parameters
Islamabad & Rawalpindi Engineering Estimate
Final Total Construction Cost
PKR 5,670,000
(Approx. PKR 56.70 Lacs / PKR 0.567 Crore)Applied Base RatePKR 3150 / sq ft1,800 Sq Ft Covered
1. Grey Structure CostPKR 3,870,000@ PKR 2,150 / sq ft
2. Finishing & Fixtures CostPKR 1,800,000@ PKR 1000 / sq ft
3. Final Turnkey TotalPKR 5,670,000All-Inclusive Complete Build
Get Detailed PDF Quote on WhatsApp
Our engineer sends an itemized breakdown within 2 hours.
Grey Structure Essential Raw Materials
Cement Bags756Pioneer / Maple Leaf
Grade 60 Steel6.84 TonsMughal / Ittehad Steel
Red Bricks75,600A-Awal Kiln Bricks
Ravi / Chenab Sand4,500 CFTCubic feet
Margalla Crush3,240 CFTCrushed Aggregate
Turnkey Finishing Material Estimates
Tiles Required1,530 SqFtPorcelain / Ceramic
Electric Wiring81 CoilsPakistan Cables 7/029
Interior Paint135 GallonsDulux / Master Paint
Sanitary Sets4 BathsMaster / Porta Fixtures
Want full rate specs & included/excluded breakdown?
View structural exclusions, tile allowances, and scope details.
Disclaimer & Market Note:
Important Notice: Base rates (PKR 3,150/sq ft turnkey) apply strictly to covered floor area. Boundary walls, roof parapet walls (parda wall), and external stairs are not included in covered area and are billed separately on actual linear measurements. Finishing material allowances (e.g. Tiles @ PKR 250-300/sq ft, Sanitary @ PKR 40k/bath) are baseline allowances; if client selects higher-cost or imported materials, client pays the price difference.